Lijiang Comprehensive Urban Rail Transit (Phase I)
CreateDate:2023-11-02
Communication
PROJECT OVERVIEW
Lijiang Comprehensive Urban Rail Transit Project starts from the Tourist Center Station in the south and ends at Yulong Snow Mountain Station in the north. The total length of the line is 20.465 km, with a total of 5 stations and 1 vehicle base. The operating control center is located in the vehicle base. The maximum, minimum, and average station spacing is 11.68 km, 1.83 km, and 5.052 km, respectively. The length of the elevated and ground lines is 0.832 km and 19.637 km, respectively, accounting for 4.05% and 95.95% of the total length of the line, respectively
PROJECT SCHEDULE
Time of winning the bid: August 10, 2021
Share to: