Yibin Autonomous Rail Rapid Transit Lines T2 and T4

CreateDate:2023-11-02


20-2

20-1

ELV control system

PROJECT OVERVIEW:

Yibin Autonomous Rail Rapid Transit Line T2 has a total length of 9.58 km and 9 stations. The main line of Yibin Autonomous Rail Line T4 is about 28.8 km, with 11 stations, all of which are ground stations. Each of the two parking lots is equipped with two fast charging spots, and one depot is equipped with 11 intelligent rail vehicles, standby and maintenance vehicles on Line T2, and 14 vehicles on Line T4

PROJECT SCHEDULE

Time of winning the bid: December 22, 2021. Line T4 commenced operation on June 26, 2023

PROJECT PERFORMANCE

The procurement project of electromechanical equipment for Yibin Autonomous Rail Rapid Transit Lines T2 and T4 mainly includes the integrated supply and service for signalling system, communication system, power monitoring system, and platform screen door system. The management scope covers design liaison, factory inspection, supply, transportation, installation supervision, joint debugging, trial operation, and training.


Share to:
Recommended Stories