Qingdao Chengyang Modern Tram Demonstration Line
CreateDate:2023-11-02
ELV control system
PROJECT OVERVIEW:
The project line has a total length of 8.77 km, with 12 stations and 1 depot
PROJECT SCHEDULE
The project commenced operation on March 5, 2016
PROJECT PERFORMANCE
UCI has designed a general integration scheme for the tram intelligent ELV control system for the project, and provided supporting core signalling system equipment. Qingdao Chengyang Tram Demonstration Line was officially put into passenger-carrying trial operation in March 2016. The self-developed tram intelligent control system and core signalling system equipment operated stably and reliably in the project.