Zhuzhou intelligent Rail Transit System
CreateDate:2023-11-02
ELV control system, power supply and construction
PROJECT OVERVIEW:
Zhuzhou Intelligent Rail Project has a total length of about 14.6 km. The first section is from Sports Center Station to Shennong Grand Theater Station, which is laid along Shennong Avenue, with a total length of 3.1 km; the second and third sections are from Hunan University of Technology Station to Zhuzhou Station then to Xiangyang Square Station. The latter sections have a total length of 11.5 km, including 15 stations and three charging substations. The maximum design speed of the vehicle is 70 km/h.
PROJECT SCHEDULE
The project commenced operation on March 30, 2021
PROJECT PERFORMANCE
Zhuzhou Intelligent Rail Project mainly includes the supply of charging substation, power monitoring system, station power lighting and other equipment for power system; the supply and installation of charging rail (including accessories) and other equipment; the supply, installation, and debugging of wired transmission equipment, wireless communication equipment, video surveillance equipment, passenger information equipment, public address equipment, power supply equipment and visual intercom equipment for communication system, dispatching center equipment, intersection priority control equipment and platform screen door linkage equipment for integrated dispatching management system, automatic fare collection system, traffic signalling lights, electronic police, platform screen doors and other equipment for intelligent transportation system.