Lishui Demonstration Section of Tram in Nanhai District, Foshan

CreateDate:2023-11-02


15

Signal and communication

PROJECT OVERVIEW:

The project line for Lishui Demonstration Section of Tram in Nanhai District starts from the central axis of Lihu New City, with a start point at Lihu New City Station.

The line is laid along the Zhongzhou Xi Street of Lihu New City, Huanzhen North Road, Caochang Industrial Avenue and Liguang Road, and the end point is located in Liheng Road Station. The line has a total length of 9.834 km, including 1.24 km of underground section, with 12 stations arranged, including 1 underground station and 1 vehicle base.

PROJECT SCHEDULE

Time of winning the bid: December 17, 2021

PROJECT PERFORMANCE

UCI, as a system integrator, undertakes the integration of ELV systems, including operational control systems and communication systems. The operation control system includes: integrated operation dispatching platform, main line turnout control subsystem, and intersection signalling control subsystem, as well as in-vehicle auxiliary subsystem, depot interlocking subsystem, maintenance monitoring subsystem, and power supply system. The communication system includes: integrated data bearer network, wireless system, wired telephone system, office automation system, video surveillance system, public address system, passenger information system, clock system, power supply system, safety and security system, and public security/fire wireless introduction system.


Share to:
Recommended Stories