Luoyang Metro Line 1

CreateDate:2023-11-02


14

Automatic fare collection system

PROJECT OVERVIEW:

Luoyang Metro Line 1 is the first subway line completed and operated in Luoyang, starting from Hongshan Station in the west and ending at Yangwan Station in the east. The line has a total length of 22.97 km, including 0.9 km of elevated line, 0.5 km of transition section, and 21.57 km of underground line; a total of 19 stations are arranged, including one elevated station and 18 underground stations.

PROJECT SCHEDULE

Line 1 commenced operation on March 28, 2021

PROJECT PERFORMANCE

UCI provides procurement service of dedicated communication system equipment and automatic fare collection system for the Luoyang Metro Line 1 project.