Shenzhen Metro Line 14 Project (Phase IV)

CreateDate:2023-11-02


13

Dedicated Communication

PROJECT OVERVIEW:

Shenzhen Metro Line 14 is a line in the Phase IV of Shenzhen Urban Rail Transit Construction Planning. The Phase I Project starts from Gangxia North Hub in Futian Central District and ends at Shatian Station. Phase I of Shenzhen Metro Line 14 has a total line of 50.34 km, with 18 stations, all underground, including 4 hub stations, 9 transfer stations and 5 standard stations, with an average station spacing of 3.1 km. 1 depot, 1 parking lot and 4 main substations are arranged in the whole line.

PROJECT SCHEDULE

Line 14 commenced operation on October 28, 2022

PROJECT PERFORMANCE

UCI provides procurement engineering of dedicated communication system for Line 14 and dedicated communication system equipment and service for Line 14 Project (Phase 2).