Shaoxing Rail Transit Line 1

CreateDate:2023-11-02


9

Electromechanical installation, professional communication, integrated supervisory control and cloud platform

PROJECT OVERVIEW:

The line has a total length of 34.1 km, with a total of 24 stations, including 23 underground stations and 1 ground station, of which 5 are transfer stations. 1 OCC (OCC and standby OCC), 2 main transformer stations and 1 parking lot are arranged on the line.

9-2

PROJECT SCHEDULE

The main line was put into operation on April 29, 2022

PROJECT PERFORMANCE

I. ELV system project

The Cloud Rail Intelligent Automation System Platform for Shaoxing Rail Transit Line 1 includes ELV systems, covering the Dedicated Communication System, Integrated Operation Management Platform System, Public Address System and Access Control System of all stations, sections, parking lots, master/standby operating control centers, and main transformer stations along the entire line.

II. Electromechanical Installation Project

The electromechanical installation project for Shaoxing Rail Transit Line 1 mainly includes the decoration and electromechanical installation of the subway station equipment area.

The construction of electromechanical installation engineering mainly includes Ventilation and Air Conditioning System, Water Supply and Drainage and Fire Water Supply System, Power Lighting System, and Integrated Support and Hanger System.

The decoration construction of the equipment area mainly includes the decoration of ceilings, floors and walls in the equipment area (including air ducts and mezzanine) except for the public area of the station (including passageway entrances and exits); wall masonry in the equipment area (including public area masonry management spare rooms, convenience service rooms, and sections), partition walls in the platform track zone, partition walls under the platform slab, elevators, safety passages, all structures, buildings and decoration works; ground ancillary (except for ground pavilions at the entrance and exit, barrier-free elevators, emergency exits, pavilions, and station square) foundation works; in addition, it also includes the air ducts, section air shafts, substations, pump rooms, doors and windows in the connecting passage, masonry and decoration works within the construction scope of this lot.