PROJECT OVERVIEW:
Qingdao Metro Line 6 is a reverse C-shaped line that runs through the central urban area of the West Coast New Area with a large traffic volume. It connects the West Coast Transportation Business Zone, the Marine High-tech Zone, the Lingshan Bay Film and Television Cultural Industry Zone, the Economic and Technological Development Zone, and the International Economic Cooperation Zone, shortening the temporal and spatial distance between the functional zones along the line, and improving the quality of public transportation services in the New Area.
Phase I Project starts from Xintun Road Station and ends at Ecological Park Station. The line has a total length of 30.762 km, including 30.696 km of underground line and 0.066 km of transition section. There are 21 stations, all underground, with an average station spacing of 1.507 km. 7 transfer stations that can transfer to Lines 1, 2, 12, 13, 21 and 22 are arranged.
PROJECT SCHEDULE :
Time of winning the bid: September 05, 2022
PROJECT PERFORMANCE
Including: the design, manufacturing, and supply of a complete set of software and hardware for 21 stations, 1 master OCC, 1 disaster recovery center, 1 depot, 1 transportation management center, 1 testing center, and 1 training center cloud platform; interface protocol and interface design between the cloud platform and other related systems.
Software: cloud management software (including multi-cloud management), network management software, operation and maintenance management software, big data software, AI platform software, big data applications, Network Security Labeling System (including hardware), and various software authorizations.
Hardware: servers, switches, storage (divided into centralized storage and distributed storage), network security equipment, modular data centers, desktop clouds, load balancing, power supplies, large screens, special instruments and meters, lightning protectors, photoelectric converters, printers, etc.