Fuzhou Rail Transit Line 4
CreateDate:2023-11-02
ELV System Integration
PROJECT OVERVIEW
The line have a total length of about 28.4 km, with 23 stations (including 8 transfer stations), 1 depot and 1 parking lot, 2 main transformer stations, 1 control center and 1 standby operating control center.
PROJECT SCHEDULE
The first section was subjected to trial operation on August 27, 2023
ELV SYSTEM INTEGRATION
Communication, integrated supervisory control, automatic fare collection, fire protection, platform screen doors and security check
PROJECT PERFORMANCE
The supply and service items with regard to the ELV system integration for Fuzhou Rail Transit Line 4 Project (Phase I) mainly include the integrated supply and service for Communication System, Integrated Supervisory Control System (including ISCS, BAS and ACS), Fire Alarm and Gas Extinguishing Systems (including installation), Automatic Fare Collection System and Security Inspection System. The management scope covers design liaison, factory inspection, supply, transportation, warehousing, delivery, installation supervision, line test, debugging, joint debugging, trial operation, opening, training, technical documents and warranty period.