Chongqing Suburban Railway Bishan-Tongliang Line
CreateDate:2023-11-02
ELV System Integration
PROJECT OVERVIEW :
The total investment of Bishan-Tongliang Line Project is estimated to be about CNY 8.6 billion. The project starts from Tongliang West Station, passes through Tongliang Station, Tongliang Xincheng Station, Pulyu Station, Dalu Station, Qinglonghu Station, Hebian Station and Daishan Avenue Station, and ends at Bishan Station in Bishan District. It runs through the planned Rail Transit Line 27 at Bishan Station. The line has a total length of 37.35 km, with 9 stations, including 3 elevated stations, 1 underground station, and 5 ground stations; Tongliang parking lot, Tongliang Xincheng main transformer station and Bishan main transformer station are arranged, among which the Bishan main transformer station is shared with the planned Rail Transit Line 27. The line is double-track, and the urban rail express vehicles with a maximum running speed of 140 km/h and a 25 kV AC system are run on the right side. The Bishan-Tongliang Line has a construction period of 4 years and an operation period of 16 years.
PROJECT SCHEDULE :
Time of winning the bid: May 22, 2023
ELV SYSTEM INTEGRATION :
Signal, communication, integrated supervisory control, automatic fare collection, fire protection, platform screen doors, security check and cloud platform